2024
SK
Polypropylene Project (PP3)
Warehouse operations, equipment installation and piping documentation in collaboration with Linde Engineering and SAM Industries.
Selected projects we have delivered since 2024.
Since 2024 we've delivered 7+ major projects, installed 11 tons of steel at Slovnaft, mobilized 40+ welders for MONDI, and grown our footprint across Europe.
2024
SK
Warehouse operations, equipment installation and piping documentation in collaboration with Linde Engineering and SAM Industries.
2024
—
Design and installation of piping for drying rail tank cars — prefabrication and on-site work, plus a compressed-air compressor.
2024
IT/SK
40+ TIG welders and pipefitters supplied for stainless-steel piping. RTG-tested during installation.
2024
DE
Low-pressure fire-protection systems and process piping for an outfitting ship — turnkey "Appendix" delivery.
2024
DE
Prefabrication and installation of thick-walled stainless and carbon-steel piping. Pipe sizes DN 25 – DN 800.
2024
DE
Industrial installation project — part of our growing footprint across the German market.
Strive, believe in yourself. Never stop dreaming.
Tell us what you need. We typically respond within one business day.